To reduce the risk of a slip
- Discuss how to protect a slope (pre-emptive)
After a slip
(If you are not familiar with the process, we explain it here)
- Recommend an engineer (post slip / insurance claim)
- Feasibility comments / early contractor involvement (concept design)
- A rough order of cost (after concept design)
- Estimated cost for several designs (multiple concept designs)
- To apply for consents (after detailed design is complete)
- Free estimate / quote (design complete / consent submitted)
Director
BSc, PgDipSci, MBA, LBP site
022 463 7674
Director
LBP Carpentry
027 6639 455